Bare Cost

Bare Cost
In this assessment, you need to estimate the bare cost and justify the calculation.
Perform the following tasks:

Task 1:
Using CostWorks, estimate the total bare cost, including overhead and profit (O&P), of a six-story-high, framed steel building with field-welded connections in Atlanta, GA.

Click here to download the data for the assessment. Use Building Construction Cost Data (BCCD) Structural Steel Projects—Section 05 12 23.77—and the provided data to create the estimate.

Task 2:
Assume you are pitching for a contract for this construction. Justify the calculations and the cost to the client in a Word document.

Submission Requirements:
Submit the following files:

  • For the estimate: An Excel file or CostWorks format, including all the data and calculations
  • For justification of the estimate: A Word document
    • Font: Arial, size 12, double-spacing
    • Citation style: APA
    • Length: 1–2 pages

Just in case you need an assignment done, hire us. Using our writing services will make your life easier because we deliver exceptional results. Use us to get an A!

We are the Best!

course-preview

275 words per page

You essay will be 275 words per page. Tell your writer how many words you need, or the pages.


12 pt Times New Roman

Unless otherwise stated, we use 12pt Arial/Times New Roman as the font for your paper.


Double line spacing

Your essay will have double spaced text. View our sample essays.


Any citation style

APA, MLA, Chicago/Turabian, Harvard, our writers are experts at formatting.


We Accept

Secure Payment
Image 3